From: | Bob Wenzlau <bob@terradex.com> |
Date: | Wed, 25 Sep 2013 23:18:57 -0700 (PDT) |
Reply: | cpeo-brownfields |
Subject: | [CPEO-BIF] Forecasting an Engineering Control or Institutional Control Breach, A Study of Third-party Excavation Activity |
Forecasting an Engineering Control or Institutional Control Breach, A Study of Third-party Excavation Activity
by Bob Wenzlau Terradex Monitor September 25, 2013 Excavations by third-parties are inevitable near any cleanup site. Of concern to cleanup site managers, these unexpected events can breach institutional or engineering controls relied upon in a site’s cleanup remedy. Third-party excavators include utility companies, developers and contractors whose work is not part of the site cleanup process. Terradex completed an analysis of excavation records for 313 sites in California from utility clearance centers during a one year period, July 1, 2012 through June 30, 2013. The 313 sites cover about 250,000 acres. The findings offer a formula for reasonable predictions of annual excavation frequency near cleanup sites. Applying these insights can inform efforts for safer and enduring cleanup site remedies. Link: http://blog.terradex.com/2013/09/25/excavation-frequency Terradex, Inc. bob@terradex.com (o) 650-227-3251 (c) 650-248-4467 Read Bob's Posts on the Monitor _______________________________________________ Brownfields mailing list Brownfields@lists.cpeo.org http://lists.cpeo.org/listinfo.cgi/brownfields-cpeo.org | |
Prev by Date: [CPEO-BIF] Forecasting an Engineering Control or Institutional Control Breach, A Study of Third-party Excavation Activity Next by Date: [CPEO-BIF] Deep wells proposed in Hopewell Junction, New York | |
Prev by Thread: [CPEO-BIF] Forecasting an Engineering Control or Institutional Control Breach, A Study of Third-party Excavation Activity Next by Thread: [CPEO-BIF] Deep wells proposed in Hopewell Junction, New York |