From: | Lenny Siegel <lsiegel@cpeo.org> |
Date: | Fri, 2 Aug 2019 08:17:21 -0700 (PDT) |
Reply: | cpeo-brownfields |
Subject: | [CPEO-BIF] Unlimited Products Engineering Co. site, Racine, Wisconsin |
City to decide on next phase of North Memorial Drive site remediation, redevelopment by Rex Davenport Racine County Eye (WI) August 1, 2019 The City of Racine appears ready to take to next steps to rehabilitate a long-vacant North Memorial Drive former industrial site and make it ready for new development. A recommendation from the Redevelopment Authority (RDA) of the City of Racine that the former industrial site be declared blighted is the next step on the path to clearing, rehabilitating and ultimately developing the property. That designation now rests with the Common Council. The “determination of blight is on the Common Council agenda for Aug. 7,” said Amy Connolly, Director of City Development. “This determination is needed before the Redevelopment Authority can accept the property from the City and begin its work on brownfield remediation and demolition on behalf of the City.” The UPEC property, 1500 Memorial Drive, is an industrial property of about 3.1 acres. It is locally known for the name of a past owner, “Unlimited Products Engineering Co.” or “UPEC.” According to RDA documents: “There are four masonry and steel buildings and one wood frame building on the site. The total floor area of the buildings is approximately 69,200 square feet.” … For the entire article, see https://www.racinecountyeye.com/city-to-decide-on-next-phase-of-north-memorial-drive-site-remediation-redevelopment/ -- Lenny Siegel Executive Director Center for Public Environmental Oversight A project of the Pacific Studies Center LSiegel@cpeo.org P.O. Box 998, Mountain View, CA 94042 Voice/Fax: 650-961-8918 http://www.cpeo.org _______________________________________________ Brownfields mailing list Brownfields@lists.cpeo.org http://lists.cpeo.org/listinfo.cgi/brownfields-cpeo.org | |
Prev by Date: [CPEO-BIF] Motorola 52nd Street plume, Phoenix, Arizona "larger than previously thought" Next by Date: [CPEO-BIF] Special Metals site, New Hartford, New York | |
Prev by Thread: [CPEO-BIF] Motorola 52nd Street plume, Phoenix, Arizona "larger than previously thought" Next by Thread: [CPEO-BIF] Special Metals site, New Hartford, New York |